With Alex.
While Alex remained in Witches Cauldron and worked away at enlarging the access into the passage leading north I continued along Toil and Trouble to Trick or Treat! along the inclined bedding and cleared a few more cobbles out of the way before setting to work excavating the sediment. The prospects ahead are looking very tantalising indeed – just out of reach, a body length ahead! Dragging the cobbles back was a little awkward so decided to set to work removing some calcited boulders and reducing them to movable lumps. It was then time to return to Witches and give Alex some assistance to remove a calcite obstruction, fill few bags of spoil and clear the debris out to the surface.
Next session will concentrate on removing the sediment in the inclined bedding and progressing down dip.