Solo
Drill/plugs and feathers packed into tackle bag, time to go ‘rock-bothering!’
At HR, very briefly scratched around the spoil heap wall extension before getting underground to attend the primary objective. At the dig in the area of An Unexpected Development a rock had been left exposed on Saturday, and it was my intention to reduce it into more manageable pieces. After this task had been achieved, I trimmed a lump off from a protruding boulder before removing a ‘lip’ of rock and calcite along the edge of the ‘hole in the floor’ to make removal of spoil a little bit easier. A pile of rocks for the wall were stacked to one side along with a couple of bags of gravel. Time to pack up and leave the cave.
Hunters’ Lodge Inn does not open on a Tuesday lunchtime so returned home, I’d forgotten my wallet anyway!.