With Nick, Tav and Jake.
Tav at the sharp end digging, Jake clearing back and loading the skip, Nick on the haul and shuttle, Vince on surface duties. 30+ bags and quite a lot of rocks were hauled out.
When time was available on the surface the retaining wall was heightened, the brambles trampled down to make for more spoil dumping space and bags were packed ready for re-use underground.
Towards the end of the session went with Nick to have a look at the end, all the small open space seen last week had been accessed and more enlargement is now required, I will arrange another visit on Tuesday with the supplier.
Still looking encouraging!