With Brockers,
Jonathon, Nick and Tav
After the lurgy
and a week at the University of Sheffield Zooarchaeology Lab, it was good to
get back into Hallowe’en Rift for my first digging session of 2019.
The plan this
session was to continue the enlargement of the passage along to Trevor’s Old
Dig, trending circa north-west. There had been some mention of a ‘pinch-point’
so this is where some of the effort was directed. Nick set-off to the end so
that he could free an old bang wire that was impeding the skip hauling.
Meanwhile, I started to remove some of the loose material that had been stashed
to the sides of the passage just beyond the pinch-point to make more room. Nick
returned and asked that I pull the old wire through, that done, Nick started to
enlarge the passage about 6m beyond me, his plan was to see if could remove
layers of calcite from the floor and so. Enlarge the passage. He did wonder
whether, or not, he was digging a pond, I guess we’ll find out next session. Filled
bags and rocks were being removed at a steady rate to Tav, positioned at the
junction, who re-directed the skip to Brockers, at the bottom of the entrance. To
keep himself occupied in between loads, Brockers had decided to do some ‘tidying’,
keeping Jon, on the surface, busy. There was an occasional grumble from above
ground, ‘Nick bag’, too heavy, too claggy, very difficult to empty, below
ground, the comments passed by.
Today’s count: 76
loads, 54 filled and emptied bags and 22 skip-loads of rock. It had been
another productive session and I, for one, enjoyed it!