Well what a turn out! Alex, Tav, Jake and Nick Hawkes has joined the team.
With a full team assembled spoil went from the dig to the surface. Continued with the clearance of the T junction. The offending slab has been obliterated and removed to the surface along with a quantity of sediment and there is easily enough space at the T junction to turnaround. Nick came up to the end for a look before we headed out of the cave. Now the junction has been cleared will probably go back to excavating along the left hand side, where the draught appears to be stronger. The right hand side will be left open for another day, although it is very tempting. We are spoilt for choices!