Vince, Brockers, Jake, Nick, and Tav.
A glorious morning, plenty of warm sunshine.
Morning session: I was digging, aided by Tav who cleared away the filled bags and occasionally loosened sediment and also filled some bags. Jake and Nick were hauling skips, transferring spoil to the surface, and some “tidying” was inevitably being carried out. Brockers hauled the bags out of the cave, the bags were stashed aside to be emptied later. Around 60-70 skip loads up to the surface and about midday, the underground team decided it was time to return to the surface and empty the bags. I stayed underground a bit longer to take some photos. Lunch was taken.
Afternoon session: My turn on the surface, Tav was at the bottom of the entrance, Jake, and Nick further along the passage clearing away from Brockers, who was digging. Another 60-70 skips-loads out to the surface and bags set aside to be emptied later at the end of the session. It was pleasant on the surface and the flies were not too irritating yet. The pulley system makes hauling so much easier. It was another productive digging session!