Turned out to be a rather disappointing session. Slight misunderstanding resulted in Alex not bringing his drill so we dragged the BEC drill to the end to carry on the good work to remove the ‘rib’ of rock only to find both batteries were flat. We were probably a little naive not to have checked the kit or to assume that the last people to use it would leave it ‘ready for use’. Never mind though better luck next time.
21st April 2012
2012 Posted on Sun, April 22, 2012 10:48:52- Comments(0) https://dighalloween.mendipgeoarch.net/?p=17
- Share