With Nick, Jake, Matt and Jonathon.
Nick and Jake went along to the dig, reeling in the wire as they went, I climbed down the pot, along Toil and Trouble, left-side of T Junction to carry-out another voice test. Not only did we achieve a positive voice connection but, a visual one too, I could see Nick’s light and then a gloved hand.
A successful test done, I returned to help Matt on the haul and shuttle, Jonathon was on the surface, hauling-out and adding to the wall and spoil heap. A constant flow of rocks and bags kept us busy. 30 skip-loads of rock and 59 bags were hauled up the surface.
Towards the end of the session, a call came back from the dig, it was looking interesting, intrigued, I couldn’t resist going up to have a look.
To the left of the connection, there was open space behind a jumble of rocks and slabs of flowstone. Although Nick and I tried to move a large slab to get a better look, time was moving on, we decided to leave it to the next session, some more digging is required. The loose sediment was tidied up and the last couple of bags and a few rocks were dragged-out to the surface.
Satisfied with the mornings progress, it was time to make our way to the Hunter’s Lodge Inn.