With Tav, Jake, Nick, Jonathon and Brockers.
Jonathon digging, assisted by Nick, Tav went into the ‘Lower’ Series to dig through the connection from that side, Jake was at the top of the slope, sending down loaded skips to me, on the haul and shuttle. Brockers was on the surface in charge of spoil dispersal.
Someone had said “that the digging might be a bit slower today”, with three digging, how wrong that statement was. The loaded skips kept coming as fast as they could be shifted. Towards the end of the session, Tav had dug through the connection and this allowed a shift in position to clear the backlog. Jake and Nick took over the haul and shuttle, I went up to the surface to help-out Brockers. Today’s count: 66 bags and 17 loads of rock, 83 skip-loads in total. Brockers had even managed to get some wall building done, good effort. Another fine session and thirsty work, ready for the pub.