1st February 2018

With Jonathon, Jake, Brockers, Nick and Duncan.

Initially, I went to the end, reeling in the wire as I progressed, to check the results of Tuesday evenings effort. It had done just what it was supposed to do. Satisfied, I turned back and took up position on the haul and shuttle. Brockers, after bailing out the pond, was upfront, aided by Nick, who was clearing back to Jake on the slope, Duncan was up top loading the skip to me. That left Jonathon on the surface, hauling and emptying.

After not very long, I had to replace the skip, we are wearing them out at an alarming rate, the plastic used to form the drums is not very resilient, probably something to do with biodegradability. Later, at the end of the session Jake mentioned the replacement skip was already worn-out. Changing the skip caused a backlog of spoil and it wasn’t too long before the team decided to move back and get the cave cleared out, I went up to the surface to join Jonathon.

The total count for this evening, 49 loads out to the surface, 25 skip-loads of rock and 24 bags.

Author: mendipgeoarch

Archaeologist, Geologist, Speleologist