1st December 2018

With Nick,
Brockers, Jonathon, Duncan and Alex

Alex, Brockers, Jonathon and Duncan disappeared underground to get
the digging underway and started to fill bags and shift rocks. Nick remained on
the surface for a short time to build some wall, I passed some rocks to Nick
and generally tidied up.

Soon it was just me on the surface and I was thankful that the
rain earlier this morning had passed over. The bags and rocks started to arrive
at a steady rate and there wasn’t any spare time to add to the wall. The bags
were all emptied, the sediment compacted into the space behind the wall that
Nick had created earlier. It was warm work and I was kept busy.

At the very end of the digging session, Nick returned to the
surface to help haul out the last few bags and rocks. A total of 82 loads out of
the cave, 62 filled bags and 20 skip-loads of rocks. A large pile of rocks
remains at the bottom of the entrance ready for shifting out next session, all
good stuff for wall building.

I was thirsty and the refreshments at the Hunter’s were very
welcome. Another productive session.