With Tav, Jon,
Dunc, Nick, Jake and Brockers
Jon’s turn in the
“pond”, Dunc chose to be next in-line again and took up position in the small
“chamber” just beyond the former “pinch-point”. It took some time to assemble
the pump and drain away the considerable quantity of water. A task made more
onerous as the pump had been left, in a safe position, on the far side of the
“lake”, the “pond” now re-designated.
Meanwhile, in the
nice dry and comfortable south passage/chamber, I was happily digging away,
filling bags, finding the occasional lump of rock, just an ideal digging spot.
Eventually though,
the “lake” was drained, the water that had been spilt lubricating the haul
route, Jon was able to start digging. Tav, at the junction, was soon very busy.
Nick, at the bottom of the entrance, had been “tidying”, the step that had accumulated over many sessions was now gone, the rocks there had joined the pile
on the surface waiting to be incorporated into the ever-growing wall.
Brockers, after
digging last session, was on the surface with Jake, hauling out the spoil from
the cave. Jake continued the wall building until a steady flow of bags started
to arrive at the surface to be emptied.
It was another
productive session; 108 loads out to the surface, 81 bags and 27 loads of rock
for the wall.
Happy days!