Report by Vince.
Vince, Alex G
Alex had decided he would like to re-visit the cave after a long break and I appreciated someone to help with the bags and other stuff.
Another phase of expansion required at the [current] end of the Cold Gnarly North. 5no. holes drilled and filled, c.500mm length x 12mm diameter; pilot holes were drilled first in each location, c.300mm (L) x 14mm (dia.) 4no. holes were into conglomerate (okay) 1no. into degraded calcite (hard going). All went off successfully. Hopefully, progress towards the echoing/draughting cross-rift will be improved. Should be plenty to clear out next digging session.