Vince, Nick, Tav, Jon, Jake, and Brockers.
Morning session: Nick and Tav in the deep South digging, Jon and me hauling the spoil away, Brockers and Jake on the surface. The filled bags and rocks were moved smoothly from the dig-face to the surface at a good, steady rate. On the surface, in between emptying bags, Jake managed to extend the terrace walling and create more spoil dumping space. When all the available bags had been filled and hauled out of the cave it was time for lunch.
Afternoon session: Me and Jon’s turn to dig in the deep Soft South down in the pot, Brockers and Jake hauled the filled bags and rocks away, Tav and Nick were on the surface. Nick and Tav found time to redistribute the amassed rockpile to where it was needed to build the next wall. Another busy and productive Saturday. The Soft South chamber is looking impressive and there is still plenty of stuff to come out. Also, a pile of rocks awaits size reduction with plug and feathers.