With Tav, Jon, Jake, Duncan, Nick, Brockers, and Caroline
The first task of the session was completed by the Technical Manager, Brockers installed a swivel on the pulley attached to the pot hauling system. Me and Tav were digging, alternating the filling of bags, and hauling the bucket up to Jon on the slippery ledge. Some adjustments were made to the hauling system to make operations a bit easier. Jake was at the junction (suffering from plantar fasciitis), Duncan at the bottom of the entrance (nursing a dodgy knee), Brockers and Nick were on the surface, they were later joined by Caroline. Between them the surface team hauled out 110 filled bags, redistributing the contents onto the spoil heap, rocks were added to another fine terrace wall on the upper level that was under construction.