2nd September

With Tav, Jake, Nick, and Jon

Grinder packed ready for action.

In the deep Soft South, initially Tav filled a few bags while I trimmed the ‘studding’. That done I took over filling bags and Tav cleared the spoil away to Jake who shuttled it along to the pot. I think Nick was on the ledge and Jon at the bottom of the entrance, temporarily stacking the filled bags.

The slab retaining wall under construction, 02/09/2023

In the sizeable chamber digging sediment and filling bags is straightforward, moving the spoil through the cave requires considerable effort. At midday digging ceased, the cave needed clearing, and we moved back to get it done. Some of the bags were already on the surface but all required emptying. About 90 bags and a couple of large boulders that didn’t come from the end dig in the deep Soft South.

Hunter’s Lodge Inn for refreshments.