24th October

Vince, Jake, Jon, Nick, and Mike

As had been requested, new short, sharp chisels and a point were obtained and taken to the cave.

In Can of Worms, Nick and Jon got digging underway. Shattered rock and calcite prised away with new tools. While down in the pot, under the stemples, in the absence of Harley, Mike had inserted himself to continue the digging there, Jake removed filled bags to the ledge. I was on the ledge moving spoil along to the entrance. When required, Jake came up from the pot to lend a hand.

As the morning progressed, the forecast rain arrived, it got heavier, water started to flow down the entrance and along the passage. Some drainage works were carried out to divert the flow of water into the area of ‘Quiet John’s old dig‘ away from the pot. An executive decision was made (by me and Jake) that filled bags and rocks should remain stacked at the bottom of the entrance (where it was pleasantly dry) and moved out at the end of the digging session when all could enjoy the pleasure of emptying bags in the rain!

At the end of the session, 60 bags had been filled, hauled, temporarily stored, and finally, emptied on to the spoil heap. A few rocks were added to the wall too. It was still raining and everyone was soggy.

Time for the pub!