With Brockers, Jake, Jon, and Nick
Met up with Brockers at 09:30 so that the installation of fixed rungs would be completed or, at least, well underway by the time the others arrived at the cave.
The lower- to mid-section rungs were placed enabling the ladder to be removed. Unfortunately, lack of battery power prevented the installation of the upper rungs, they will have to wait for another day. Jake, Jon, and Nick had arrived, so digging could commence.
Me and Brockers were down in the pot filling bags and moving rocks (Brockers had a long wrestle with an especially large rock the was well jammed into a crevice). Jake was on the now rather slippery ledge, Nick was at the junction, Jon temporarily storing the spoil at the bottom of the entrance. When all the available bags were filled, and a pile of rocks accumulated it was time to clear out the cave and we all moved back.
It was disappointing to see that ‘someone’ had been up to his usual antics, the mindless and exceedingly pointless erosion of cave passage!
Just the one session again this weekend, did not bother going to the Hunter’s.