With the full team today – Jake, Tav, Nick and Alex.
Nick and Alex set about emptying the pile of bags in the entrance while the rest of us went along to the dig to fill up some more bags. It hasn’t dried up at all so Toil and Trouble is still rather squalid. Jake did the first stint at digging while Tav filled the bags I was in ‘T’ Junction where the bags/rocks were temporarily stored. When we ran out of bags I went down to the pot and we hauled the spoil from ‘T’ Junction back. Nick arrived with more empty bags which were sent up to the dig while the spoil was removed to the surface. With the entrance cleared the full team was then able to shift spoil from the dig all the way back, progress at the dig face was good and a considerable quantity of spoil was excavated. Another fine session.