17th October 2016

Solo.

At the current end of Merlin’s drilled 7no. holes – 3no. on either side and 1no. in large flake of flowstone in the floor, all prep done, retired to a safe distance, made some loud noise, the cave shook! There will be rubble for the weekend.

Author: mendipgeoarch

Archaeologist, Geologist, Speleologist