With Jake.
Filled 10 bags of spoil each, putting some rocks aside until next session, then moved back to clear the 20 bags out to the surface.
Yesterday I went over to Upper Canada Cave, Hutton to do a little job for the Axbridge CG digging team. Plan was to reduce a couple of boulders at the end of the cave to something of a more manageable size and enable a better look at the potential beyond. I’ll have to wait until next week to find out how it went.