27th March

Vince, Roz and Brockers. Later in the morning, Caroline helped out with emptying the bags.

At the cave the work was concentrated on the uppermost level and cleaning a section there, this involved some reduced level excavation. Started the session digging on my side, by the end I was kneeling. 40 bags were filled, dragged away, and hauled out of the cave (the hauling done by Brockers). Caroline turned up to lend a hand as we started to empty the bags.

The uppermost level, cleaning the section underway. 6″ trowel for scale because I forgot to bring the proper scale.

Author: mendipgeoarch

Archaeologist, Geologist, Speleologist