1st May 2017

With Roz.

After a visit to the suppliers and prep work done it was off to Hallowe’en Rift to continue the expansion work to the south-side, at the present end of Merlin’s.

Six holes were drilled, 4no. in the roof and right (west) side and 2no. in bulge of rock, lower on the left (east) side. Roz took the photographs. It sounded good from Stal Bend.


Stopped at the Queen Vic for a bowl of chunky chips each and some liquid refreshments.

Then the skies opened, impressive thunder.

Author: mendipgeoarch

Archaeologist, Geologist, Speleologist